Transportation

Sound Transit, Tacoma Trestle Track & Signal

2024-07-29T16:18:49-07:00

Tacoma Trestle Track & Signal The Tacoma Trestle Track and Signal project is a collaborative effort between Sound Transit, WSDOT, and the City of Tacoma to build a new bridge supporting double tracks and a passenger platform. The project consisted of the demolition of an existing single-track railroad trestle and the construction

City of Tukwila, S BAR/Airport Way Seismic Retrofit

2020-02-28T12:18:11-08:00

South Boeing Access Road over Airport Way Seismic Retrofit The South Boeing Access Road over Airport Way project will provide structural analysis and seismic retrofit for the existing concrete structure. The work performed by 1 Alliance consisted of performing limited topographic mapping to provide a preliminary base map for project improvements. 1

WSDOT, SR 520 West Approach Bridge North

2020-02-28T14:41:51-08:00

SR 520 West Approach Bridge North This West Approach Bridge North project replaced the existing 1.2-mile long bridge structure that was seismically vulnerable to a catastrophic earthquake and extended SR 520’s three westbound lanes from the floating bridge to the Montlake area in Seattle. 1 Alliance provided design-build surveying services, including control

City of Kirkland, 100th Avenue Northeast Corridor

2020-02-12T11:16:01-08:00

100th Avenue NE Corridor Improvements As one of the busiest arterials in the City of Kirkland, the project designed improvements on 100th Avenue Northeast Corridor between Northeast 132nd and Northeast 145th streets to address issues on this busy corridor such as lack of sidewalks and bicycle lanes, excessive congestion, and inefficient intersections.

Tulalip Tribes, I-5/116th Street NE Interchange Improvements

2020-02-27T17:00:59-08:00

I-5/116th Street NE Interchange Improvements Phase 3 of the interchange improvements project reconstructed the existing three-lane bridge over I-5 to a six-lane bridge and connected the widening of 116th east and west of the interstate. 1 Alliance provided structural surveying of the bridge structure drilled shaft, bridge substructure, bridge superstructure, bridge approach

WSDOT, I-5 Portland Avenue to Port of Tacoma Road – Northbound HOV

2020-02-28T12:14:57-08:00

I-5 Portland Avenue to Port of Tacoma Road - Northbound HOV As part of the Tacoma/Pierce County HOV Program, the project widened northbound I-5 to provide room for one HOV lane to increase capacity and improve freeway access between Portland Avenue to Port of Tacoma Road. 1 Alliance performed roadway and structural

WSDOT, SR 167 Southbound HOT Lane

2020-02-27T17:04:03-08:00

SR 167 Southbound HOT Lane The project widened SR 167 to add a lane in the southbound direction and constructed a new flyover ramp connecting the High Occupancy Toll (HOT) Lanes system to the carpool lanes on I-405, providing an extension of the HOV/HOT lane for approximately eight (8) miles. 1 Alliance

WSDOT, SR 520 West Connection Bridge

2020-02-27T17:09:10-08:00

SR 520 West Connection Bridge As part of the SR 520 Floating Bridge Replacement and HOV program, 1 Alliance provided surveying services for the 1,330-foot long West Connection Bridge that connected the new floating bridge to the existing SR 520 roadway. The 1 Alliance team provided structure and roadway surveying tasks that

xxx ver video de sexo indonesia bokep simontok joyporn www sex videos hd com video sexo 18 aos porncuze porn110 porn120 oiporn pornthx blueporn roxporn silverporn porn700 porn10 porn40 free porn fre nudist porn900 arab porn blowjob