SR 520 West Connection Bridge

As part of the SR 520 Floating Bridge Replacement and HOV program, 1 Alliance provided surveying services for the 1,330-foot long West Connection Bridge that connected the new floating bridge to the existing SR 520 roadway.

The 1 Alliance team provided structure and roadway surveying tasks that include horizontal and vertical control, pier shaft layout, column layout and centering, pier cap layout, bearing pad/oak block layout and grading girder profiles, edge of deck layout, temporary striping, barrier demolition control, temporary barrier, luminaire layout, and final channelization.

Project Details

OWNER

WSDOT

LOCATION

Seattle, Washington

INVOLVEMENT

2013 – 2014